WJ Multi Services, Freeport, FL

Walk-in shower conversion · Freeport, FL

Walk-In Shower Conversion, Built to Drain Properly

Curbless and low-threshold showers with correct slope, waterproofing you can't see, and a written price before anything comes off the wall.

What you get in writing
Free in-person visit45 min
Line-by-line estimate24 hrs
Schedule, datedIncluded
Workmanship guarantee1 year

Signed & delivered within 24 hrs of your visit.

Contractor

FL licensed

Coverage

Fully insured

Projects

100+ completed

Guarantee

1-year written

The problem

A shower fails at the parts you never see.

Slope, pan and waterproofing decide whether a shower lasts fifteen years or leaks in two. Those are the lines most quotes leave vague.

01

Proper pitch to the drain and full waterproofing, specified on the estimate rather than assumed.

02

Curbless or low-threshold entries sized to your actual door and floor height.

03

Glass, niche and bench decisions priced up front, not added later.

04

1-year written workmanship guarantee on every conversion.

Our process

1

A free 45-min in-person visit

We measure in person, not over the phone, and talk through what you actually need.

2

A written estimate in 24 hours

Every material and labor line item, on paper, before you commit to a thing.

3

Work on the written schedule

Then a 1-year written guarantee once we hand the keys back.

Real projects

Before / after, on the same square footage.

Same footprint, same budget, the only variable is a plan that was written down before the first tile came off the wall.

Finished walk-in shower remodel with limestone tile and brass fixturesDated bathroom with worn tile and an old built-in bathtub before remodelingBeforeAfter

Move the seam to compare

The guarantee

One year, in writing.

Workmanship is guaranteed for a full year on the same document that carries your price and your schedule. If something we built isn't right, we come back and correct it, no negotiation, no invoice.

Straight answers

The things people ask before they sign.

It feels expensive.

The estimate shows what's behind the tile as well as on it. Cheap shower work is usually cheap where it can't be inspected.

How long will it take?

Most conversions run about one to two weeks, with the dates written on the estimate.

Can you convert without moving the plumbing?

Often yes. We confirm during the free 45-minute visit and price it either way before you decide.

Is a curbless shower safe for aging in place?

It's one of the best changes you can make, see our accessible bathroom page for the full setup.

Request a written estimate

Start with a free 45-minute visit.

No obligation. You'll have the numbers in writing before you decide anything.

Prefer to text first?
WhatsApp · (850) 226-9559

We reply with a written estimate within 24 hours of your visit.